Floor Screed Calculator

Section View (Base Slab + Screed)
Volume Required: 0
🧱 Cement (50kg Bags): 0
🏖️ Plaster/River Sand (m³): 0
*Assuming 1:4 mix uses ~7.5 bags/m³.
Basis of Calculation:
  • 1:3 Mix: ~9 bags cement + 1.1 m³ sand per m³ screed. (High wear areas).
  • 1:4 Mix: ~7.5 bags cement + 1.1 m³ sand per m³ screed. (Standard domestic).
  • Thickness: Recommended minimum 25mm for bonded screed, 40mm for unbonded.
  • Waste: 10% recommended to account for base slab undulations.